What does project cargo coordination in Brazil involve?
Technical planning, the right equipment, permits and a controlled sequence from port to site.
- Technical survey of dimensions, weight and centre of gravity
- Choice of flat rack, open top or break bulk
- Port operations and lifting plans in Brazil
- Special road transport, route surveys and traffic permits
- Customs coordination for the equipment
Brazil-specific planning points
Road permits, route restrictions and port windows drive the schedule.
Oversized road moves in Brazil require authorizations and route checks for bridges, overpasses and power lines. Aligning the vessel arrival, port window and road permits avoids costly waiting time.
Experience with heavy and oversized cargo
Vision Log and the Centaurea brand have handled transformers and industrial equipment in Brazil.
Each project is planned individually; we share a clear plan and milestones before the cargo leaves origin.
How it works
- SurveyDrawings, dimensions and weights.
- EngineeringEquipment, route and lifting plan.
- PermitsPort and road authorizations.
- ExecutionDischarge, lifting and road move.
- Site deliveryDelivery at the job site.
Typical cargo
- Power transformers and generators
- Industrial machinery and production lines
- Steel structures and modules
- Oil and gas equipment
What to send us first
- Drawings with dimensions and centre of gravity
- Lifting and lashing points
- Final delivery address and site access
- Target on-site date